Construction & Engineering
Oracle Primavera, centralized in DojoCOMMAND
Oracle Primavera keeps doing what it does best. DojoCOMMAND brings its projects, budgets, rfis into the same back office as every other system you run, so your team works from one record, one set of numbers and one inbox.
Revenue Pipeline
Deals from Oracle Primavera, live across 5 rooftops · refreshed 32 seconds ago
- Oracle Primavera2mStage moved to Finance on Camry Hybrid
- Inbox6mWhatsApp reply logged to the deal record
- Inventory11mLand Cruiser GXR reserved for test drive
| Deal | Stage | Owner | Value |
|---|---|---|---|
| Test drive | A. Haddad | $68,400 | |
| Proposal | M. Ortiz | $231,000 | |
| Finance | J. Patel | $34,900 | |
| Negotiation | S. Kim | $41,250 |
What the Oracle Primavera connector does
Reviewed against the vendor's official developer documentation.
- Status
- Beta
- Categories
- Construction & Engineering
- Industries
- Construction & engineering, Real estate developers & brokerages, Energy, oil & gas, Manufacturing & industrial distribution, Facilities management
- Regions
- GCC, India, Singapore, Malaysia, US, UK, EU & ANZ
- DojoCOMMAND can pull
- Projects
- Budgets
- RFIs
- Submittals
- Schedules
- DojoCOMMAND can push
- RFIs
- Documents
- Observations
- Webhooks
- No. Changes are picked up on a schedule.
- Key limits
- API surface differs between P6 EPPM and Primavera Cloud.
- Access follows each user’s project permissions in the source system.
- No webhooks; changes are picked up on a scheduled sync.
- Access requirements
- Admin access to the client account to authorize the connection.
- Plan or partner requirements to be confirmed with the vendor during onboarding.
What flows into your DojoCOMMAND
We map Oracle Primavera to the shared DojoCOMMAND data model, sync it in both directions where the API allows, and Managed Link monitors the connection so it keeps working.
- Records mapped to the shared DojoCOMMAND data model
- Changes synced in both directions
- Sync health monitored around the clock
Before and after
Data lives in one more tool, and someone exports it by hand when the numbers are needed.
It shows up in the same hub as every other system, ready for reports, automations and alerts.
What your brand gains
One source of truth
No more copies of the same record drifting apart across tools.
Less re-keying
Data entered once is available everywhere it is needed.
Monitored for you
Managed Link watches the connection and fixes it before anyone notices.
Modules Oracle Primavera powers
Once connected, Oracle Primavera data is available to these parts of DojoCOMMAND straight away.
Works with these native apps
More in Construction & Engineering
See all integrationsOracle Primavera and its logo are trademarks of their respective owner. Use here identifies compatibility only and does not imply endorsement. See third-party trademarks.