Anyone building a DojoCOMMAND · 5 min read

Choosing your first suites

A practical way to decide which of the ten suites to switch on first, and which can wait.

Follow the money first

If you can only switch on one suite, choose the one closest to revenue. For most operators that is RevOps (leads, pipeline and follow-up) or Finance (payments and reporting). Wins there pay for everything that follows.

Then fix the loudest handoff

Ask your team where work gets dropped. Sales to service? Service to billing? Field crews to the office? The suite that owns that handoff is your second switch.

  • Sales to service: RevOps and Service
  • Field to office: ERP and Operations
  • Hiring to day one: People and LMS

Connect before you replace

Every suite works with the software you already use. Connect your existing systems first and run them side by side for a month. Replace a tool only when the native app clearly does the job better.

Leave room to grow

Suites can be switched on at any time and are priced per location. There is no penalty for starting small, so start with what you will actually use this quarter.

One hub

Ready to run it as one operation?

Pick the native apps you need, connect the ones you already have, and see your DojoCOMMAND price live. Or start with a fixed-price Blueprint and we'll map it for you.